+31 640 779 745
info@indes-tech.com

ALCO ENERGY ROTTERDAM B.V.

Project: EPC Execution of Sulfuric acid tank installation, will be automatically dosed to an existing tank with a new pump, a new flow meter and new PCV-U / FRP line.

Installation of Pumps for aspiration and impulsion, E & I works.

BRL-K903 / 08 certificate has been provided. 

ALCO ENERGY ROTTERDAM
ALIPHOS ROTTERDAM B.V.