LOCATION: TUROW POWER PLANT – BOGATYNIA (POLAND)
Work Carried out:
Piping works BOP
Manpower dierente scope
Commissioning – start up-
INDES PERFORMS FABRICATION WORKS FOR THE PROJECT "BIOMASS ELECTRIC GENERATION PLANT" (ENCE PUERTOLLANO) FULLY COMMITTED WITH THE HIGHEST QUALITY REQUIREMENTS, IN COLLABORATION WITH OCA GLOBAL.
Proyecto: Montaje mecánico de tuberías en sch 10S en acero inoxidable 304L, Pinto (España)
We starten de montage van de koeltoren in Guadalajara [ TORIJA ] voor Linde.
We start the assembly of the Cooling tower in Guadalajara [ TORIJA ] for Linde.
INDES IN BIOMASS PLANT ENCE HUELVA HAS SUCCESSFULLY PASSED THE FIRST 3 HYDRAULIC PRESSURE TEST OF THE BOILER AND FEEDWATER LINES.
Ph1: 232 bar
Ph2: 255 bar
Ph3: 189 bar
We continue working hard and surpassing milestone.
PIPING BOILER BIOMASS PLANT
PREFABRICATION AND ASSEMBLY PIPING AND SUPPORT
MANPOWER DIFFERENT SCOPE
Commissioning – start up-
Biomass Plant Huelva- ENCE (Spain)
DESIGN, ASSEMBLY AND COMMISSIONING OF VARIOUS ELECTRICAL INSTALLATIONS AND INSTRUMENTATION IN THE FUEL STORAGE PLANT.
Design, installation and start-up of a fire-fighting system using hand-held lances in the refinery sphere park.
San Roque, Cádiz
Project: Piping and structures for a new phosphoric acid tank.
Installation of piping to 6 pumps from the existing and the new tank, including 6 flow measuring sets and sampling points.
Project: Pipe and structures for a new phosphoric acid tank. Installation of pipe to 6 pumps from existing and new tanks, including 6 sets of flow measurement and sampling points.
Project: EPC Execution of Sulfuric acid tank installation, will be automatically dosed to an existing tank with a new pump, a new flow meter and new PCV-U / FRP line.
Installation of Pumps for aspiration and impulsion, E & I works.
BRL-K903 / 08 certificate has been provided.
Work carried out:
Mechanical work for connection of lines to the new RTO2 unit at the bioethanol plant for ALCO ENERGY ROTTERDAM B.V.
Civil works
Electrical work consisting of electrical connection and linking up of the new unit from the existing MCC.
Instrumentation work for the correct functioning of the equipment consisting of installing the PT, FSL, LEL: flowmeters and motorized valves.
Customer: ALCO ENERGY ROTTERDAM B.V