Project: HAL Geothermal (prefabrication) (Netherlands) Client: Verkade (V.C.T.) 

TECNICAS REUNIDAS- BUDIMEX CARBON THERMAL POWER PLANT.

LOCATION: TUROW POWER PLANT – BOGATYNIA (POLAND)

Work Carried out:


Piping works BOP
Manpower dierente scope

Commissioning – start up- 

SERVICE TERMINAL ROTTERDAM (NETHERLANDS)

Project:Mechanical and E&I installation for new LA73 (Netherlands) 

PETRESA

Enter your text here ...

OCA GLOBAL

INDES PERFORMS FABRICATION WORKS FOR THE PROJECT "BIOMASS ELECTRIC GENERATION PLANT" (ENCE PUERTOLLANO) FULLY COMMITTED WITH THE HIGHEST QUALITY REQUIREMENTS, IN COLLABORATION WITH OCA GLOBAL. 

NIPPON GASES, PINTO (SPAIN)

Proyecto: Montaje mecánico de tuberías en sch 10S en acero inoxidable 304L, Pinto (España) 

LINDE GAS. EUROPORT (NETHERLANDS)

Proyect: Europort two new CO2 plant Mechanical (Netherlands) 

LINDE GAS, NAVIA SPAIN

Proyecto: Montaje planta de oxígeno, Navia (Spain). 

Koeltoren in Torija Spain

We starten de montage van de koeltoren in Guadalajara [ TORIJA ] voor Linde. 

We start the assembly of the Cooling tower in Guadalajara [ TORIJA ] for Linde.

INDES IN BIOMASS PLANT ENCE

INDES IN BIOMASS PLANT ENCE HUELVA HAS SUCCESSFULLY PASSED THE FIRST 3 HYDRAULIC PRESSURE TEST OF THE BOILER AND FEEDWATER LINES.

Ph1: 232 bar
Ph2: 255 bar
Ph3: 189 bar

We continue working hard and surpassing milestone. 

GESTAMP BIOMASS – SENER

PIPING BOILER BIOMASS PLANT

PREFABRICATION AND ASSEMBLY PIPING AND SUPPORT

MANPOWER DIFFERENT SCOPE

Commissioning – start up-

Biomass Plant Huelva- ENCE (Spain) 

GBS SENER ENCE

Start of assembly work for boiler piping at Puertollano Biomass Plant. 

CLH

DESIGN, ASSEMBLY AND COMMISSIONING OF VARIOUS ELECTRICAL INSTALLATIONS AND INSTRUMENTATION IN THE FUEL STORAGE PLANT.


CEPSA REFINERÍA GIBRALTAR

Enter your text here ...

CEPSA REFINERÍA GIBRALTAR

Design, installation and start-up of a fire-fighting system using hand-held lances in the refinery sphere park.

San Roque, Cádiz 

CABOT ACTIVATED CARBON

Proyect: Replacement of the existing BO3 Main Unit filter (Netherlands) 

ALIPHOS ROTTERDAM B.V.

Project: Piping and structures for a new phosphoric acid tank.

Installation of piping to 6 pumps from the existing and the new tank, including 6 flow measuring sets and sampling points.

Project: Pipe and structures for a new phosphoric acid tank. Installation of pipe to 6 pumps from existing and new tanks, including 6 sets of flow measurement and sampling points. 

ALIPHOS

Enter your text here ...

ALCO ENERGY ROTTERDAM B.V.

Project: EPC Execution of Sulfuric acid tank installation, will be automatically dosed to an existing tank with a new pump, a new flow meter and new PCV-U / FRP line.

Installation of Pumps for aspiration and impulsion, E & I works.

BRL-K903 / 08 certificate has been provided. 

ALCO ENERGY ROTTERDAM B.V

Work carried out:

Mechanical work for connection of lines to the new RTO2 unit at the bioethanol plant for ALCO ENERGY ROTTERDAM B.V.

Civil works

Electrical work consisting of electrical connection and linking up of the new unit from the existing MCC.

Instrumentation work for the correct functioning of the equipment consisting of installing the PT, FSL, LEL: flowmeters and motorized valves.

Customer: ALCO ENERGY ROTTERDAM B.V

Location: ALCO ENERGY ROTTERDAM B.V – Europoort- Rottedam (Netherlands) 10, haven nr 5629.